Meet Filmo at BITAM Show — Stand 105a, Madrid, 28–29 October
Filmo home

Warehouse, dispatch and returns

Know what is ready, what went out and what came back.

From a dry hire collection to an event load-out, work from the equipment already reserved on the order. Prepare it, record what actually leaves and check its condition when it returns.

Start free trial

By quantity or by individual unit. Scanning is optional.

Example order · lighting and sound

Riverside · weekend hire

12 LED PARs · 2 active speakers

  1. Prepare

    10 of 12 lights ready

  2. Deliver

    Record what leaves

  3. Receive

    Count what comes back

  4. Check

    Record its condition

Returned equipment still needs checking before it is released from the order.

Four moments that keep the warehouse moving.

The same order follows the equipment from preparation to its return.

Start the day with the collections and returns that are due.

See pending deliveries and returns across orders, grouped by date. Find the lighting hire a customer is collecting and the sound system coming back from a conference, then open the right checklist.

Two outgoing groups and one return are due on Friday: a dry hire collection, the sound system from a conference and lighting for an event.

Prepare ten lights now. Keep the other two in view.

Mark the quantity that is ready and choose the individual units for equipment with serial numbers. Save the preparation on the order so the next person can see what is ready and what still needs picking.

The example moves from eight to ten of twelve LED PARs prepared, then saves. Two lights remain to prepare. Speakers PA-021 and PA-022 are assigned to the order.

Make the delivery record match what actually left.

If only ten of the twelve lights leave, record those ten. Check the remaining quantity before finishing the delivery: what was not delivered is cancelled and released from the order. The finished group keeps that record fixed.

A finished partial delivery: of twelve LED PARs ordered, ten were delivered and two cancelled. Both speakers were delivered. The finished group cannot be reopened.

Back in the warehouse is one step. Checked is the next.

Record what came back, then check its condition. Returned equipment still takes up stock until it is checked in. If a speaker comes back damaged, mark its condition and create the Maintenance incident when closing the return.

Ten LED PARs are returned and eight checked in: two still need checking. Speaker PA-021 is checked in in good condition; PA-022 is returned with an incident condition, awaiting checking and incident creation.

A few practical warehouse questions.

Do we need to scan every item?

No. You can prepare and deliver quantities or select individual units by hand. Scanning is optional and requires the equipment identification add-on. The same workflow works for dry hire and equipment used at events.

Does returning equipment make it available straight away?

Marking it Returned does not release it. It needs to be checked in with its condition, or processed when the return is finished. Before closing the last return, review every group and any equipment still out: finalization can also check in outstanding lines.

What if more equipment is needed after a delivery is finished?

A finished delivery cannot be reopened. Add the extra equipment to the order: for a date whose delivery is already finished, Filmo creates a second delivery group for that day.

Are damage and losses handled automatically?

A condition alert is not yet a Maintenance incident: create it when closing the return. Marking a unit Lost does not remove it from inventory. Deactivate the serial number or correct the quantity if the equipment is actually lost.

Frequently Asked Questions

Quick answers to common questions about how Filmo works, what it costs and how teams get started.

Start with a 14-dayfree trial of Filmo.

Start free trial

14-day free trial · Full access · No credit card required