Resources · Blog/·Updated ·8 min read
How to Quote a Technical Event: Line Items, an Example and the Mistakes That Cost Margin
Build a technical quote around equipment, crew, logistics and the full production schedule. A two-day conference example shows what to include and where costs can be missed.
Quoting a technical event means turning a brief (dates, venue, headcount, running order) into a list of equipment, people and logistics with a price and a margin. The hard part is not the list: it is making sure nothing is missing that you end up paying for yourself, like the build day, the overtime at load-out, the last-minute subrental or the van that makes two trips.
What you need to know before you quote
- Dates and times: build, rehearsal, show and load-out days, with venue access hours.
- The venue: floor plans, height, rigging points, available power and whether there is an in-house technician or equipment.
- Headcount and format: plenary, panels, breakout rooms, streaming, simultaneous interpretation.
- Running order: how many speakers, how many mics at once, videos, remote links.
- Who decides and when: the deadline to close the quote and whether other suppliers are bidding.
If any of this is missing, quote on written assumptions («assumes 63 A three-phase power at the venue») instead of leaving a blank. Use those assumptions to agree how a change will affect scope, price and approval before the work proceeds.
The seven line items of a technical quote
- Your own equipment, by day. Sound, lighting, video, truss and cabling. Charge per day of use and decide how you charge consecutive days: many companies apply a multiplier, so three days don't cost three times one.
- Subrentals. What you don't own and rent from another company, at cost plus your margin. If you don't keep it separate, you won't know whether the event made money.
- Crew. By day and role (sound, lighting and video technicians, stagehands), with how long a day really lasts, overtime, night work and public holidays.
- Transport and logistics. Vans or trucks, round trips, loading and unloading, tolls and parking.
- Per diems, travel and accommodation, if the event is out of town.
- Consumables and extras: tape, batteries, gaffer, printing, any specific insurance the venue asks for.
- Technical direction and office time. Pre-production hours, site visits, drawings and coordination. It is the most forgotten line and the one with the most work behind it.
An example: a two-day conference for 300 people
A guide to the structure, not a rate card: every company has its own prices. The event has one build day, two conference days and load-out on the last night.
| Line item | What it covers | How it is calculated |
|---|---|---|
| Sound | PA, console, 6 wireless mics, monitors | Equipment × days with multiplier |
| Video | Projector, screen, simple vision mixing, recording | Equipment × days + projector subrental |
| Lighting | Stage and lectern, no show | Equipment × days |
| Crew | Sound, video and lighting technicians and two stagehands | Days per role + load-out overtime |
| Transport | One truck, two trips | Trips + loading and unloading |
| Office | Site visit, drawings, coordination | Technical direction hours |
Distinguish markup on cost from margin on revenue. In a hypothetical example, a total cost of €700 and a price of €1,000 leave €300, or a 30% margin on revenue; a 30% markup on €700 gives a price of €910 and a margin of about 23.1%. These are arithmetic examples, not recommended rates. Keep applicable taxes separate and state whether they are included.
The mistakes that cost the most margin
- Not charging for the build or load-out day. The equipment is out of the warehouse and the crew is working, even with no audience.
- Pricing crew by show hours instead of real days: the technician arrives before doors and leaves after the last cable.
- Forgetting to subrent what is already booked on another job those dates. Check availability before you send, not after.
- Putting your own and subrented gear on one line: the price may be the same, the margin isn't.
- Sending the quote late. In a pitch, the first serious quote has the edge.
- Not setting terms: how long the quote is valid, the deposit, payment terms and what happens if the client cancels or changes the programme.
Terms worth including every time
- Set quote validity and the separate action or agreement that reserves equipment. Acceptance and reservation should not be assumed to be the same step.
- A deposit on confirmation and the balance on delivery or after the event, with payment terms.
- Cancellation: what is charged depending on how many days are left.
- Changes: how new requests are quoted once the quote is accepted.
- Technical assumptions: power, access, build times and who provides what.
How Filmo does it
In Filmo, documents can be created from the order’s equipment and services. Import with NEO helps match a client’s list to your catalogue for review before applying it. Equipment reservation, staff assignment and quote acceptance are separate steps: accepting a quote does not reserve stock. Subrentals can cover shortages, and the Profitability add-on compares virtual, forecast and actual figures from the documents recorded. See technical event production and AI quoting.
Technical event quotes: frequently asked questions
- Should the build day be charged?
- Yes. The equipment is no longer available for another job and the crew is working. Many companies charge it as a full equipment and crew day, or with their own multiplier, but it shouldn't come free.
- How do you charge equipment for several days in a row?
- The usual approach is a multiplier by number of days, so the daily price drops the longer the rental. What matters is that it is the same on every quote and written down, not decided by each salesperson.
- What margin is usual on a subrental?
- Start with supplier cost plus transport, coordination and the risk your agreement assigns to you. Choose a price that covers that work; there is no universal margin. Keep the cost visible internally even if the customer sees a package price.
- Should the quote include VAT?
- Always say whether prices include VAT and which rate applies. Between businesses it is usual to quote without VAT and add it at the end, but say so clearly so the comparison with other suppliers is fair.